O
Bedford
← All officials
PG

Chair· March 18, 2024 - March 2027

Phil Greazzo

Bedford

No biography on file yet.

At a glance

News mentions
1

Term ending Mar 1, 2027.

Voice

Meetings spoken in
13
Total speaking time
55:43
Avg per meeting
4:17
Segments
1232

Want every word Greazzo has said?

The OpenCity MCP for Claude.ai answers questions like “what has Greazzo said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (16)(Roads)

medium↓Aug 2026[11]

Acceptance of Indian Rock Road

Town assumes maintenance costs, offset by the $169,396 developer stormwater contribution.

medium↑Apr 2026[11]

Meetinghouse Roundabout navigation

Safety countermeasures at intersections could carry future costs, not yet quantified.

high↑Oct 2026[10]

Market & Main traffic and parking conditions

Encore has indicated it will fund a new traffic study and signal-timing work; costs of any mitigation are not yet known.

medium↑Oct 2026[10]

South River Road right-turn-on-red change

medium↑Oct 2026[10]

Cut into newly paved Bedford Center Road under five-year moratorium

A $25,000 bond plus a $1,000 inspection deposit protect the town financially; the applicant pays all restoration costs.

medium↓Jun 2026[6]

Route 114 Corridor Study

Deferred state funding means Route 101 improvements may not happen this cycle.

medium↓Jun 2026[2]

Crash history at North Amherst Street and Wallace Road

HSIP funding could cover improvements, but the application burden is high and typically requires a serious crash history.

high↓May 2026[2]

Proposed guardrail removals on Beals Road and Back River Road

Guardrail end units run about $6,000 each — a 100-foot section can cost $16,000 — so removing unneeded rails avoids future replacement costs.

medium↓Jul 2026[2]

Liberty Hill Road reconstruction and detour

medium↓Jun 2026[2]

McAllister Street and New Boston Road turning conflicts

low↓May 2026[2]

Request for no-engine-braking restriction on Route 101

high↓May 2026[2]

Adoption of AASHTO Roadside Design Guide for guardrails

Guardrails cost roughly $6,000 per end unit, so a defensible standard could save the town money on unneeded rails.

high↓Jan 2026[1]

2026-2027 Road Reconstruction Program

A proposed $500K roads article would have added about $0.08 to the tax rate (~$56 on a $700K home).

medium↓Feb 2026[1]

Pedestrian access to Constitution Drive from Cottage Court development

A sidewalk and retaining wall could cost far more than a typical sidewalk — an expense the applicant said would be passed on to future homebuyers.

high↓Jan 2026[1]

Nashua Road bridge reconstruction over Riddle Brook

Town's share is about $500K from existing local roads funding — no new taxes for the engineering phase, though a future warrant article will be needed for construction.

low↓Apr 2026[1]

Apple Leaf Drive truck turnaround

Decisions during term (3)

Recorded while Greazzo was in office — not necessarily decisions they moved, spoke to, or voted on.